This document contains the revised activity plan of the TEMPUS project (without budget elements - Part 1, and in Part 3)
COMMISSION OF THE EUROPEAN COMMUNITIES
Directorate General XXII - Education, Training and Youth
ANNEX II
Tempus
PhareJoint European Project
(2nd year)Revised Budget and Activity Plan for 1999/2000
The Revised Budget and Activity Plan (2nd year)
is to be returned in TWO copies by registered mail
by 15 February 2000 at the latest
(date as per postmark)
One copy to: |
One copy to: |
Commission of the European Communities |
European Training Foundation |
Directorate-General XXII |
Mr. P. Bedewell |
Education, Training and Youth |
Head of Tempus Department |
Mr. G. Massangioli |
Viale Settimio Severo, 65 |
Head of Unit |
I - 10133 TORINO (Italy) |
B-7 8/49 |
|
rue de la Loi, 200 |
|
B - 1049 Bruxelles (Belgium) |
|
The Revised Budget and Activity Plan has to be signed by the person legally authorised to represent the Contracting Institution.
I, the undersigned, certify that the information given in the present Revised Budget and Activity Plan is correct to the best of my knowledge and is endorsed by all institutions participating in the Joint European Project concerned.
Done at : BUDAPEST
Date : February 15, 2000
Name : ÁKOS DETREKOI
Institution : BUDAPEST UNIVERSITY OF TECHNOLOGY AND ECONOMICS
Function : RECTOR
Original signature : ..............................................................................
INTRODUCTION
The main aim of the Revised Budget and Activity Plan is to plan the expenses and activities for the academic year 1999/2000 more precisely. The objective of the project and consequently the main activities should, however, remain the same as planned in the Original Application form.
The Revised Budget and Activity Plan will be assessed and when approved will have contractual value and be the basis for further monitoring of your project by the Commission.
The maximum amount of the grant is stated in the Special Provisions of the Contract. Please note that the activities and the distribution of the budget can only be modified within the total grant for the given year. Further changes to the breakdown of the budget (beyond the limits given in the Contract) and the proposed activities cannot be introduced without prior written approval from the Commission.
Projects entering their second year should indicate the amounts transferred from the academic year 1998/99, as explained in Annex II/6.
Instructions
|
This document should be typewritten on the forms provided. Please do not forget to fill in your Contract number at the top of each page. The Revised Budget and Activity Plan should be completed by the Contractor. Please send two copies. The Annual Report 1998/99 and this Revised Budget and Activity Plan MUST be sent together in the same envelope. Faxed forms will not be accepted. Failure to return the Revised Budget and Activity Plan by 15 February 2000 will result in an automatic request for reimbursement of the first instalment of the grant for the given year. You MUST send your Revised Budget and Activity Plan by registered mail. Only receipts from post offices and official carriers will be accepted as proof of dispatch.
|
Part II
Work plan 1999/2000
The purpose of this table is to assist both the Contractors and the Commission by focusing on the concrete outputs to be achieved as a measure of the progress of a project. It is important to note that you should provide a complete picture of all of the activities necessary for the achievement of each output during 1999/2000.
It was indicated in the Annual Report as well that some problems were caused by the late beginning of the project (signature of the contract in January 1999 instead of November 1998 according to the application) and especially by the late arrival of financial support (April 1999). The management tried to shift the planned activities, but because of the fixed dates of the academic year this shift in some cases was not possible, i.e. it took more than 2 months. It must be underlined that all activities planned for the 1st year have been fully carried out by the date of preparation of this report.
Because of the favorable internal and external conditions there is a real chance for quicker extension of our experience in alternating (sandwich type) education to other universities, enterprises, countries. That is the reason of our request in a small repartition of the budget, precisely in the increase of amount for W-E, E-W, W-W mobility. This modification in the first 2 cases is less than 10% of the corresponding budget lines. In the 3rd case (W-W) concerns less than 3% of the total TEMPUS support.
WORKPLAN for 2nd project year
|
|
|
|||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Outputs/Activities |
Dec |
Jan |
Feb |
Mar |
Apr |
May |
June |
Jul |
Aug |
Sep |
Oct |
Nov |
|
2. Documentation about the alternating education |
|
0 |
|
|
|
|
|
|
|
|
|
|
|
2.1. Preparation of basic documentation (updating) |
X X X X |
|
|
|
|
|
|
|
|
|
|
|
|
2.2. Pilot use of documentation, evaluation |
X X X X |
X X X X = |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3. Creating networks and training persons |
|
|
|
|
|
|
|
|
|
0 |
|
|
|
3.1. Establishment of 5 networks of trained specialists |
X X X X |
X X X X |
X X X X |
X X X X |
X X X X |
X X X X |
X X X X |
X X X X |
X X X X |
X X X X |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4. Pilot and regular work of alternating training |
|
|
|
|
|
|
|
|
|
|
|
0 |
|
4.1. Piloting of system in existing sandwich modules |
|
|
|
|
|
|
|
|
|
X X X X |
X X X X |
X X X X |
|
4.2. Organization of new modules, final evaluation, proposals, extension |
|
X X X X |
X X X X |
|
|
X X X X |
|
|
|
X X X X |
X X X X |
X X X X = |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Deadline for achievement of output: O
Activities carried out in the partner country: X
Activities carried out in the EU: =
If necessary, please use additional sheets of same format.
Part III
Information on cancelled activities and/or activities transferred from the 1st project year to 2nd project year
In the table below you should:
a) give a brief description of activities transferred to 1999/2000 and cancelled activities
b) tick the appropriate column in relation to each of the activities
Activities |
Overlapping |
Postponed |
Cancelled |
Reasons |
|
Consortium meeting (2.2. evaluation , planned for October 1999) |
|
to Jan. 22-26, 2000 |
|
Because of the delay in the beginning of the project this activity was held 3 months later |
|
Workshop in Hungary (4. Pilot and regular work of alternative training, planned for Fall 99) |
|
to May 25-28, 2000 |
|
The workshop was divided in 2 parts. Hungarian universities, Ministry were informed in Vasszécsény (H, Nov, 99). A 2nd workshop is planned to other participants in Visegrad (H, May 2000) |
|
Printing and publishing (2.1. Preparation of basic documentation) |
|
to Spring 2000 |
|
The documentation was disseminated via Internet and by xero-copies. The printed variants will be published in this semester |
|
Other costs |
|
X |
|
Bank charges were lower than expected |
|
|
|
|
|
|
|
TOTAL AMOUNT TRANSFERRED |
PAGE FOR ACKNOWLEDGEMENT OF RECEIPT
|
|
Your name: PETER MOSON
Full address:
BUDAPEST UNIVERSITY OF TECHNOLOGY AND ECONOMICS
HUNGARY H - 1521 BUDAPEST Country code Postal code Town |
This page of the form will be returned to you on receipt of your Revised Budget and Activity Plan. Therefore please enter your name and address in the box above.
For internal use only.
We acknowledge receipt of your 1999/2000 Revised Budget and Activity Plan for the
Joint European Project No.
|
|||
|
|
|
|
under the Tempus Phare Scheme.
Yours sincerely,
Place, ........................................ Date, ...............................
|